Specification
Installation
1. Disassemble the two self colour lugs from the hinge and weld in position to the gate post.
2. Drill a hole through the gate frame to suit the thread size.
3. Once the gate has been galvanised or painted, assemble the hinge and use the 2 nuts to adjust the position of the gate.
4. Lubricate during fitting and once every 6 months to ensure maximum product life